Emergency Replacement of lift pumps on an active flightline for the US Army Aviation. Two pumps needed to be replaced to maintain sanitation flow. Agile rapidly analyzed the problem and replaced the pumps and controls when it was discovered the controls were causing an imbalance between the motors. The damage had been done to the motors and required replacement. Agile replaced the custom controller with an updated system.